Sunbridge Parkway

Project Limits

Orange County is conducting the Sunbridge Parkway Preliminary Design Study (PDS). The primary study corridor is south of Aerospace Parkway and east of Roberts Island Slough, extending to the Orange/Osceola County line (approximately 6.3 miles).

Overview

In 2004, Orange County approved the Innovation Way Overlay, a vision for East Orange County as a mixed-use, high-tech corridor connecting the University of Central Florida, Lake Nona’s Medical City and the Orlando International Airport. In 2016, Orange County approved amendments to the comprehensive plan related to a project known as Sunbridge, including amendments to the Long Range Transportation Plan to incorporate certain framework roadways serving the area. Included among these framework roadways was a roadway extending from the Beachline Expressway to the Orange/Osceola County line, which is now known as Sunbridge Parkway. The Central Florida Expressway Authority began construction in 2016 of an interchange between the Beachline Expressway and Innovation Way to the north and Sunbridge Parkway to the south, extending to a realignment of Aerospace Parkway This new interchange is anticipated to be fully completed in mid-2018. The extension of Sunbridge Parkway into Osceola County, combined with extensions of Dowden Road and Innovation Way South from Sunbridge Parkway to the Central Florida Greeneway and Narcoossee Road, will vastly improve regional connectivity in southeast Orange County.

Project Description

The study limits begin roughly one mile south of the intersection of Sunbridge Parkway and Aerospace Parkway and extend to the Orange/Osceola County line. The portion of Sunbridge Parkway lying between Aerospace Parkway and the beginning of the study area is currently under design, with construction anticipated to commence in early 2018. Sunbridge Parkway is envisioned as a four (4) lane divided roadway that is to be constructed over time in phases. The roadway segments included in this study comprise a major component of the critical roadway network required to support Orange County’s vision for East Orange County. The project is located in Orange County Commission District 4.

The PDS will assess current and future travel demand in the area and identify a recommended roadway alignment that is intended to provide greater regional connectivity and travel options while people and vehicles move safely and conveniently along the corridor. The study will include design traffic projections and identify conceptual improvement recommendations within the proposed right-of-way.

Project Map

Project Map Location

Public Involvement

Public input will play a key role in the Study process. As such, the County will be hosting a community meeting to present preliminary concepts related to the roadway extension. The meeting will be publicly posted at least two weeks prior to the meeting date.

  • Florida Trend Magazine, 8/28/17 Ranchland to Rooftops Article Synopsis: The Deseret Ranch Development and Proposed Roadways
  • BCC Hearing = March 20, 2018
    Time: 9:00 a.m.
    Location: Orange County Administration Center, Commission Chambers, 1st Floor, 201 South Rosalind Avenue,
    Orlando, FL 32801

Contact Us

Roberto Ng, P.E., Senior Engineer
Orange County Engineering
4200 S. John Young Parkway
Orlando FL 32839

Email: roberto.ng@ocfl.net
Phone: (407) 836-8067
Fax: (407) 836-8024


En Espanol:

Jonathan Fong, PE
Public Works Department
Engineering Division
4200 S. John Young Parkway
Orlando FL 32839

Email: jonathan.fong@ocfl.net
Phone: (407) 836-7976
Fax: (407) 836-8079

All e-mail sent to this address becomes part of Orange County public record. Comments received by our e-mail subsystem can be read by anyone who requests that privilege. In compliance with "Government in the Sunshine" laws, Orange County Government must make available, at request, any and all information not deemed a threat to the security of law enforcement agencies and personnel.